CASE STUDY MI SNOW MELTING CABLE ASSEMBLIES

  MI snow melting cable assemblies help developer lease upscale retail lifestyle center!

CSA Logo
Click here to read the article from Chain Store Age Magazine

CHALLENGE
Even in the harshest weather conditions, shopping malls see a lot of foot traffic. So what can be done to prepare for snow and ice? For decades, the method has been to deal with snow and ice after the damage has been done, relying upon an outside contractor to remove snow. Many property owners may find themselves saying, "There must be a better way." They're right.

SOLUTION
Delta-Therm's patented MI snow melting cable and automatic DTC control system were custom designed and built for an upscale life style center. Not only is the solution capable of providing immediate relief, but it is also a less expensive solution than relying on an outside contractor

RESULT
Instead of waiting for blizzards to dump snow and ice and calling an outside contractor to deal with the problem, the lifestyle center owners are the calm in the center of the storm. They rely on Delta-Therm's MI snow melting cables to warm pavement, keeping snow and ice from accumulating. There is no salt on shoppers' shoes which means nothing is tracked into stores. The results are clean, safe surfaces and tenants who can focus on doing what they do best: assisting clientele.
Delta-Therm's patented MI snow melting cable assemblies are custom built typically within two weeks of placing an order. Each finished cable assembly is meggered, hypotted, and metered and is placed in water for a minimum of 12 hours and is then retested before shipping.
View All Products



More Case Studies:

Custom panel increases production

MI heating cables warm low land gorillas

Constant wattage cables help power plant obtain 20 year life extension

Ice melt panels successfully maintain drain path during 16" snow fall

MI snow melting cables help developer lease retail stores

Tire track snow melting provides safe access and saves costs