CASE STUDY CONSTANT WATTAGE CABLE |
 |
|
Delta-Therm constant wattage help maintenance staff improve routine maintenance and obtain 20 year life extension.

request a reprint of the Nuclear News Article
- CHALLENGE
- How can a power plant replace an outdated heat tape and heat transfer cement temperature maintenance system without a major shut down?
- SOLUTION
- Delta-Therm's flexible constant wattage cable was installed during routine maintenance on pipes. The cable was covered with an aluminum heat transfer tape to help spread the heat around the pipe.
- RESULT
- This is the first plant in the United States to be a 20-year life extension and will remain open through 2034.
-
|
|
|