Heat Source News Article

NEW DTC AND MPS QUICK INSTALL GUIDES


page 1 of Q.I.G. for wiring a DTC120-G to Power Control Panel with G.F.P.E.

We just added 9 new Quick Install Guides to our literature library for our DTC120-S, DTC120-PS, and DTC120-G snow melting and roof deicing control line.

These are full color illustrative guides on how to install and wire your control to one of our three load switching panels: Enclosed Contactor, Control Panel with G.F.P.E., or Low Noise Relay Panel. There is one wiring guide per control and load switching device, step 5 changes depending upon which panel you are wiring the control to.


page 2 of Q.I.G. for wiring a DTC120-G to Power Control Panel with G.F.P.E.

Below are the pdf files for each quick install guide:

DTC120-S snow melting control

DTC120-S Wired to Enclosed Contactor Panel
DTC120-S Wired to Power Control Panel with G.F.P.E.
DTC120-S Wired to LNR Panel

DTC120-PS snow melt control

DTC120-PS Wired to Enclosed Contactor Panel
DTC120-PS Wired to Power Control Panel with G.F.P.E.
DTC120-PS Wired to LNR Panel

DTC120-G roof deicing control

DTC120-G Wired to Enclosed Contactor Panel
DTC120-G Wired to Power Control Panel with G.F.P.E.
DTC120-G Wired to LNR Panel